Riverbank Embankment Construction – UseFul

Our solar power house has been chosen as a rest area at a riverbank construction site.

photo of "UseFul" installed in front of our solar power house at a riverbank embankment construction site
It is located along the river in Joso City, Ibaraki Prefecture. The Tone River flows behind the house. The riverbank is being improved to prevent flooding from the Tone River.
The auxiliary power generation unit, UseFul, is also utilized at the site to compensate for the lack of sunlight during the winter months.
Since the solar-powered house operates without a commercial power supply, it contributes to electricity savings as well.
photo of the riverbank embankment construction site
photo of the controller installed on the wall of the interior of the solar power house