Harumi 5-chome Athletes’ Village Project

Our solar power house is being used as an on-site office during the construction of the Tokyo Olympic Athletes’ Village.

photo 1 of our solar power house installed at the Village Project
Our solar power houses are currently being utilized as an on-site office for the construction of the Athletes’ Village for the 2020 Tokyo Olympics.
Originally, this house was intended to serve as a rest area, but it is now being used as office space.
(We have also conducted simulations to assess the actual power consumption available for use.)
photo 2 of our solar power house installed at the Village Project
photo 3 of our solar power house installed at the Village Project